
Van Marcke HQ
- Van Marcke HQ
- Aalbeke, Belgium
- Indoor
What
- 105 m² green textile
- 2000 plants
- 3 types = Schefflera (upper), Ctenanthe (middle), Spathiphyllum (bottom)
Installation specifics
- 5 day installation
- Standard mounting GreenTecStyle® composite
- Directly mounted to a solid concrete wall
- With climbers (due to limited space availability)
Partners
- Substrate: GreenTecStyle® by Sioen
- Frame profiles: Vermako NV
- Watering system: Mastop BV
- Plants: Denis Plants BVBA
- Installation: Abtec BVBA
- Engineering: Vermako NV
- Maintenance: Van Vlierden Daktuinen BVBA